Bathroom Remodel Day 4 - July 17, 2013


D0 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 DW C


Plumbers put in 6.5 hours of work in on Wednesday

Old 0.5" shower pipes clipped, sealed & removed

New pipes and shutoff valves to the sinks

Pipes for new wall mounted shower installed

0.75" pipes feed both shower faucets

Shower head placed 84" above the shower pan

Shower pan liner installed

More pressure with 0.75" pipes to new hand-held shower

Old bathtub drained moved 6 inches to shower center

Old shower drain capped and concreted over