Bathroom Remodel Day 10 - July 26, 2013


D0 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 DW C


New bathroom door arrives at 830am

COB 4pm - shower lip has tile, floor tile has grout

Floor tile done, shower lip front dark, top & inside light

Throne area has dark tile baseboards & walls painted

Closet wall end altered for 90° shower glass connection

Closet needs 2 thin tiles at back and baseboards still

90° wall for shower glass and tiled bench

New bathroom entry door & frame in place, needs paint

Beige paint on wall, vanity arrives tomorrow