Bathroom Remodel Day 9 - July 25, 2013


D0 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16 D17 DW C


Noon status: shower floor tile is almost done!

Have one spot where 3 white tiles are adjacent

A little more shower tile is needed before complete

The shower is really coming around!

Old vent removed and hole patched over

Jacuzzi tub access area in next bedroom patched over

Done for the day at 3pm

Dark floor tile is in place and drying

Dark floor to light wall tile with combination in between

Door down to prevent walking on wet tile overnight