The ARF prepares the SRB aft & forward skirt, frustum & nose cap for launch |
I'll take two with extra pepperoni |
Leave your badge outside to help identify remains |
Inside the blast proof Ordnance Build Up room, the frustum has ordnance on both the top & bottom |
Aft skirt with booster separation motors removed |
1 of 4 bolt holes that secure the SRB to the pad |
Aft skirt with booster separation motors before the component is covered with cork |
Thrust Vector Control System within aft skirt gimbals the nozzle extension to control flight |
Separation ring removes Frustum during descent |
Main Parachute Support Structure contains 3 chutes |
Forward booster separation motors at the top of the frustum and a nose cap on the right stand |
Forward skirt, frustum, and nose cone stack |
Nose cap contains the drogue and pilot parachutes |
Forward skirt in a painting chamber |
The curing room is empty today |
David admires a painted & cured forward skirt |
Extra buildup cork patches applied . . . |
. . . before the component is sprayed with cork |
Corked explosive bolt containment devices |
Lisa's middle name is Danger |