![]() The SRB DF is stationed at CCAFS Hanger AF |
![]() The Recovery ships deliver the SRBs to the DF slip |
![]() One SRB at a time is inserted into the slip |
![]() A huge rolling crane lifts the SRBs out of the slip |
![]() Manatees enjoy the slip in between flights |
![]() The crane lowers the SRBs onto rail dolly trains |
![]() Lisa and Jon check out the huge SRB crane |
![]() The SRB parachutes are rolled up on spools at sea |
![]() Empty rail dollies rest beyond the first wash facility |
![]() Looking back toward the first SRB Wash Facility |
![]() The SRBs are disassembled within Hangar AF |
![]() Flight foam is removed from the each component |
![]() An aft skirt receives a final power washing |
![]() A spotlessly clean aft skirt is now ready for rebuild |