Rocks used for Crawler transporter path are pushed away from sidewalk when Crawler not in use. |
Orbiter enters the OPF through grey doors of the 2 high bays, see the slots for the orbiters tall tail? |
The Space Shuttle Atlantis is readied for STS-121, the launch after Return to Flight |
Orbiter Manuvering System (OMS) above and Space Shuttle Main Engine (SSME) below |
A look inside the SSME compartment |
Looking forward from the SSME area |
Climb up a level for a straight on view of the OMS |
View of the whole OMS pod |
Tour guide, Mike, shows us the payload bay view |
The second robotic arm on right will give enough length for tile inspections under orbiter |
Left leading edge of Atlantis with tile protectors |
Damage here caused the loss of Columbia's crew |
Twin rear landing gear of Atlantis |
Orbiter supported by External Tank connection points |
Shuttle's fuel intake point from the external tank |
David, Jon, Cathy, and Lisa pose with Atlantis |
Cathy and Lisa in front of a SSME |
Remove thyselves before flight ! |